Nottingham, NG1 to NG9

Commercial EV charge point installation in Nottingham.

Nottingham is the one English city where every workplace parking space carries an annual levy, which makes what those spaces deliver a genuine budget question.

07487 696567

Send the site postcode and a rough bay count. The load assessment answers the rest.

Commercial

Where is the property?

The postcode tells us your area and your network operator.

So we can check you are in our area
Either way is fine. It changes what we quote for.

Local detail

What commercial EV charging looks like in Nottingham

The workplace parking levy changes the sums

Employers pay an annual charge per workplace parking space, unique to Nottingham in England. Once a space costs money to exist, making it useful to staff is a defensible spend rather than a perk. [confirm: current threshold and per-space charge]

Business parks and city premises

The demand splits between out-of-town business parks with room for bays and city-centre premises where the parking is constrained, shared, or leased from someone else.

Planned work, not call-out

At around thirty miles this is the furthest point we cover. That suits commercial installations, which are scheduled anyway, and it is worth knowing before you rely on us for a fault.

How a commercial job goes

How commercial EV charging installation works

The order matters. Sizing the bays before assessing the supply is how sites end up with a quote that doubles when the network operator gets involved.

  1. Site survey and load assessment

    Incoming supply, distribution, existing peak demand and the parking layout. We establish the real ceiling before anyone talks about how many bays you want.

  2. Design and network operator

    Bay count, unit rating and the load management strategy. Where the site needs more capacity, the application to the network operator is handled as part of the job.

  3. Installation and civils

    Containment, trenching and ducting where the run needs it, units mounted or on pedestals, protection fitted where vehicles manoeuvre.

  4. Commission, certify and hand over

    Circuits tested and recorded, back-office and access control configured, and whoever manages the site shown how it works.

The technical bit

What decides commercial EV charging costs

Nearly every commercial quote turns on the first two rows. Get those right and the rest is design.

Unit ratings7kW single-phase, 11kW and 22kW three-phase
Bay countDetermined by the load assessment, not the wish list
Load managementDynamic, shared across bays
Supply upgradeOnly where the assessment shows it is needed
StandardBS 7671, current edition
Inspection and testingPeriodic, to whatever interval the site requires
Installed-from priceTo be confirmed

Charger brands, scheme registration numbers and guarantee terms to be confirmed with the client before publication.

Who does the work

Qualified, insured and certified EV charger installers

Your job does not go to whoever answers first. Every installer working on our jobs clears the same six checks, and we verify them rather than take anyone's word for it. Here is the bar your installer will have met.

Registered with a competent person scheme

Your installer will be NAPIT registered, which is a government-approved scheme. It means the work is certified and notified without you needing a building control application.

TrustMark registered

We check for TrustMark, the government-endorsed standard for work in and around the home. It covers technical competence, trading practice and customer service, not just wiring.

Public liability insurance in date

We see the certificate before we send anyone a job, and you get a copy with your quote. An expired policy is the most common thing we turn installers away for.

Qualified, and experienced with EVs

City and Guilds qualified electricians working to BS 7671, with EV charging experience specifically. A charger circuit is not the place for someone learning on your house.

Workmanship guaranteed

Your installation comes with a workmanship guarantee from the installer, separate from and on top of the manufacturer warranty on the unit itself.

Publicly reviewed, and good

We only work with installers who have a public review record worth reading. Yours has over 160 positive Google reviews and a maintained TrustATrader profile.

Scheme registration numbers and insurance certificates come with your quote, so you can verify them yourself rather than taking a website's word for it. How we choose installers sets out all six checks, including what gets someone turned away.

A woman standing beside an electric car on a driveway, charging from a wall-mounted charge point on the house wall
A finished domestic installation. Unit sited for the way the car actually parks, with the cable routed to keep it off the walking route.

Next step

Send us a NG1 site postcode and a rough bay count.

We come back with what the supply will carry, what that means for the bay count, and where load management changes the answer.

Request a site assessmentCall 07487 696567

Questions

Commercial EV charging questions from Nottingham

Does the workplace parking levy apply to charging bays?

The levy applies to workplace parking spaces themselves. What charging changes is what you get back from a space you are already paying for. Check your own liability with the council, because the detail depends on your site.

Can we install charging on leased premises?

Usually, with the landlord's consent, and that consent is the step to start early. Who owns the parking and who pays for the electricity both need settling before design.

Do you cover Nottingham business parks?

Yes, for planned commercial installations across the NG postcodes.

Get a quote

Ask about commercial charging in Nottingham

Site postcode, rough bay count and what the parking is used for.

  • No cost, and no obligation to book anything
  • Your details are never sold on or passed around
  • A fixed price for the work described, in writing

Would rather talk it through? Call 07487 696567.

Type 2 charging cable plugged into the charging port of a white electric car on a driveway at home

Most homes take a 7kW charge point without any change to the supply. We check yours before quoting.

Free quote
We call back rather than email a form letter
So we can check you are in our area
Property type, where the charging point should go, how far from the fuse board

Your details are used to quote your job and nothing else. See our privacy notice.

CallGet a quote